Portfolio

Tunnels & Galleries

Cavern Formwork
Gare SMC - Société du Grand Paris

The construction site is located at the foot of the current Saint-Maur-Creteil RER station, on an 8,300 m² area between Rue des Remises and Rue Bobillot. With its outer walls sunk to a depth of 70 meters and platforms located at

52 meters, the future station will be the deepest in France.CALDIBE is proud to collaborate with Coffrage&Quipage on manufacturing this great vault formwork project for Line 15 T2B at Gare SMC.

Video: Assembly process

  • Engineering Project by
  • Coffrage&Quipage
  • Country
  • France
  • Category
  • Tunnel-Carrier
  • Date Created
  • 2022

PRODUCTION PROCESS: DAM GATE

OTHER PROJECTS: XACBAL FORMWORK TUNNEL